Understanding the Pool Building Timeline: A Guide

A dad holding his baby out of the water

Deciding to build a pool in your backyard is an exciting venture that promises endless hours of fun, relaxation, and added property value. However, understanding the pool building timeline is crucial to set realistic expectations and ensure a smooth construction process. Hiring a professional Phoenix Pool Builder is the best way to achieve your dream pool efficiently and effectively. Below, we’ll take a look at a general timeline, but of course, you should discuss this with your chosen pool builder and they’ll give you their exact timeline for your new pool.

1. Initial Consultation and Design (1-3 Weeks)

The Initial Meeting

The pool building process begins with an initial consultation with a professional pool builder. During this meeting, you will discuss your vision, budget, and any specific features you want, such as waterfalls, spas, or custom lighting. The builder will assess your property, taking measurements and evaluating the site for potential challenges.

Design Proposal

Based on your discussion, the pool builder will create a design proposal. This includes detailed plans and 3D renderings to help you visualize the final product. This stage involves collaboration and revisions until you are completely satisfied with the design.

Approval and Permits

Once the design is finalized, the builder will obtain the necessary permits from local authorities. This process can take anywhere from a few days to several weeks, depending on your location and the complexity of the project.

2. Excavation and Rough Grading (1-2 Weeks)

Site Preparation

With permits in hand, the pool builder will begin preparing the site. This involves marking the pool layout and ensuring the area is ready for excavation.

Excavation

Excavation is a critical phase where heavy machinery is used to dig the pool’s shape according to the design specifications. The builder will remove soil and rocks, ensuring the excavation is precise and matches the planned dimensions.

Rough Grading

After excavation, the site undergoes rough grading to create a level base for the pool structure. This step is essential to ensure the pool’s stability and proper drainage.

3. Structural Work (2-4 Weeks)

Steel Reinforcement

The next step involves installing a steel framework, known as rebar, to reinforce the pool structure. This provides strength and durability, forming the backbone of the pool.

Plumbing and Electrical

Plumbing lines and electrical conduits are installed for water circulation, filtration, heating, and lighting. Proper installation of these systems is crucial for the pool’s functionality and safety.

Gunite or Shotcrete Application

The pool’s shell is formed using gunite or shotcrete, a mixture of concrete and sand applied using high-pressure hoses. This creates a strong, durable structure that will form the pool’s walls and floor.

Curing

The concrete shell needs time to cure and harden. This typically takes about one to two weeks, depending on weather conditions and the specific materials used.

4. Tile and Coping Installation (1-2 Weeks)

Tile Installation

Once the shell has cured, the builder will install tiles along the waterline. Tiles add an aesthetic touch and provide a smooth surface for easy cleaning.

Coping

Coping, the material used to cap the pool shell’s edge, is then installed. This can be made of stone, brick, or concrete and provides a finished look while serving as a transition between the pool and the surrounding deck.

5. Deck Installation (1-3 Weeks)

Deck Planning

The pool deck is an essential part of the pool area, providing space for lounging, entertaining, and safe entry and exit from the pool. The builder will help you choose materials and design that complement your pool and landscape.

Deck Construction

Deck construction involves laying the foundation, installing the chosen materials, and finishing with a sealant or protective coating. This process can vary in time depending on the complexity and size of the deck.

6. Interior Finish (1-2 Weeks)

Plaster or Alternative Finish

The pool’s interior finish is applied, which can be plaster, pebble, quartz, or another material. This finish not only waterproofs the pool but also determines its final appearance.

Water Filling

Once the interior finish is applied and cured, the pool is filled with water. This step marks the nearing completion of the construction process.

7. Final Touches and Inspections (1 Week)

Equipment Installation

The builder will install and test all pool equipment, including pumps, filters, heaters, and lighting. Ensuring everything functions correctly is crucial for a smooth pool operation.

Landscaping and Final Clean-Up

Final touches include landscaping around the pool area, cleaning up the construction site, and making sure everything is in pristine condition.

Inspection and Handover

A final inspection by local authorities may be required to ensure the pool meets all safety and building codes. Once approved, the builder will conduct a walkthrough with you, explaining how to operate and maintain your new pool.

Conclusion: Ready to Dive In

Building a pool is a significant investment that requires careful planning and execution. Understanding the pool building timeline helps set realistic expectations and ensures a smoother construction process. Hiring a professional pool builder not only guarantees high-quality work but also provides the expertise and support needed to bring your vision to life. With patience and collaboration, you’ll soon be ready to enjoy your beautiful new pool.